LIST OF LRH RECORDED LECTURES GIVEN IN 1969

TAPED LECTURES
In 1976 a FLAG TAPE MASTER LIST was compiled and issued. It had a few omission, but was by far the most complete list ever done by the Church.

In the 1990s, the late Ken Ogger who gave himself for nickname “THE PILOT” published the most exhaustive list of LRH conferences ever made. Using my own unique background as a Class XII and Sea Org Member on Tech lines at Flag for nearly 20 years and numerous contacts and sources of help.

I have filled the holes in the Pilot list and explained the current status of each lecture.

Since the advent of the Golden Age of Tech a number of lectures have been quietly buries and the very name and existence of those conferences been erased from Scientology official teaching. The Church current position is that those lectures never existed, even though they exit in previous compilations. The Church has ordered destruction of those conferences by any of the faithfuls who still happen to own one.

None of the lectures given by L. Ron Hubbard in 1969 are part of the GOLDEN AGE OF KNOWLEDGE. NONE OF THEM ARE LISTED IN THE NEW TECH VOLUMES ISSUED IN 1991.

Except for the Welcome to the Sea Org Lectures, all of the following conferences have been quietly buried and in the 1990s ordered destroyed by organizations who had them .

The transcripts for tapes marked with an X have been leaked out and are available outside the Church.

This list includes 9 lectures that are not on the original FLAG MASTER LRH TAPE LIST nor the PILOT TAPE LIST.

LIST OF LRH RECORDED LECTURES GIVEN IN 1969:
February 02 R-Factor Talk To Registrars (1959) LISTED IN OLD TECH VOLS AND LISTS BY ERROR – TAPE IS FROM 1959, NOT 1969
May 27 Planning Operations and Actions CONFIDENTIAL AIDES ONLY
May 29 First Standard Dianetics Graduation Dianetic Program X LISTED IN OLD TECH VOLS – NOT ON ANY SCN COURSE AFTER THE 1974 HSDC
September 01 Flag Central Command Area-its Security and Activities CONFIDENTIAL AIDES ONLY
October 15 WSO-1 THE QUALITY OF THE SEA ORG AND WHAT IS A SEAMAN x LISTED IN OLD TECH VOLS – PART OF SEA ORG BASICS TRAINING
October 16 WSO-2 Welcome to the Sea Org Drills x LISTED IN OLD TECH VOLS – PART OF SEA ORG BASICS TRAINING
October 17 WSO-3 Why the Sea Org Is Successful x LISTED IN OLD TECH VOLS – PART OF SEA ORG BASICS TRAINING
October 20 WSO-4 Third Dynamic Activity and Making Things Go Right x LISTED IN OLD TECH VOLS – PART OF SEA ORG BASICS TRAINING
October 21 WSO 5 It Is a PRO World x LISTED IN OLD TECH VOLS – PART OF SEA ORG BASICS TRAINING
October 30 New Flag Management System CONFIDENTIAL AIDES ONLY
November 02 Covert Operations AIDES CONFERENCE X CONFIDENTIAL PR AND GUARDIAN OFFICE HATS ONLY
November 06 COVERT OPERATIONS X CONFIDENTIAL FLAG ORG OFFICER CONFERENCE
November 12 PRO AREA CONTROL x CONFIDENTIAL PR AND GUARDIAN OFFICE HATS ONLY
December 10 Actions on OK CONFIDENTIAL AIDES ONLY
December 13 Programmes 1970 CONFIDENTIAL AIDES ONLY

Complete list of all Technical Issues-1969

The following is an exhaustive and complete list of all Technical Issues published along with their status. As a rule all issues written by someone else than LRH have been cancelled, even if doing so caused knowledge or vital advice to be lost. For example: Bulletins about Triple Rudiments have never been replaced and as a result, almost every auditor in the field have been mis-running Triple or Quad Rudiments. Scores of detailed drills covering anything from Handling Audiences to auditing correctly every processes on the Grades or actual Case Remedies have been cancelled without ever being replaced.

The first year that has been compiled is the year 1969. Unless specified otheerwise, all issues are HCOBs
DATE                                    TITLE                                                           STATUS

January 05 UNRESOLVING CASES – ADDITIONAL NOTE CURRENT TECH VOLS
January 08 DRUGS AND INSANITY NON-COMPLIANCE AND ALTER-IS CURRENT TECH VOLS
January 23 THE STANDARD CANCELLED – WRITTEN BY OTTO ROOS
January 24 SUB-ZEROS TRIPLE GRADES LOWER LEVELS TRIPLE GRADES OLD TECH VOLS
January 24 SUMMARY REPORT * CANCELLED
January 25 TARGETS AND COMPUTERS CURRENT TECH VOLS
January 25 TRIPLE LOWER GRADES OLD TECH VOLS
January 28 HANDLING TRIPLE * CANCELLED
January 29 TRIPLE AND EXTERIOR * CANCELLED
January 30 TRIPLE RUDIMENTS * CANCELLED
February 03 TRIPLE GRADES FLOWS CURRENT TECH VOLS
February 03 TRIPLE GRADES OLD TECH VOLS
February 07 THE BODY COMM PROCESS CANCELLED – WRITTEN BY DR JARVIS AND OTTO ROOS REISSUED 1970 AS HCOB ATTRIBUTED TO LRH
February 09 Research Notes RE THE TRIPLE GRADES CURRENT TECH VOLS
February 11 USE OF TRIPLE RUDIMENTS * CANCELLED
February 12 L4A FOR ASSESSMENT OF ALL LISTING QUESTIONS SEE HCOB 15 DEC 68
February 14 CASE ENTRY – CASE SUPERVISOR ACTIONS * CANCELLED
February 18 STAGE PRESENCE TRAINING DRILLS – TR20 CANCELLED
February 18 STAGE PRESENCE TRAINING DRILLS – TR21 CANCELLED
February 18 STAGE PRESENCE TRAINING DRILLS – TR22 CANCELLED
February 28 MEDICAL DOCTORS CURRENT TECH VOLS
March 03 CASE GAIN COMPLETING LEVELS CURRENT TECH VOLS
March 12 AUDITOR’S REPORT TRIPLE GRADES OLD TECH VOLS
March 12 PHYSICALLY ILL PCS AND PRE OTS CURRENT TECH VOLS
March 14 IT IS OK FOR ANY CLASS VIII * CANCELLED
March 17 POLITICS CURRENT TECH VOLS
March 17 Summary Report Form Auditor Admin Series 12RA CURRENT TECH VOLS
April 02 DIANETIC ASSISTS CURRENT TECH VOLS
April 05 NEW PRECLEARS The Workability of Scientology CURRENT TECH VOLS
April 06 DIANETICS COURSE AUDITING REQUIREMENTS CURRENT TECH VOLS
April 06 FUNDAMENTAL AUDITING CURRENT TECH VOLS
April 11 DIANETIC HEALTH FORM OLD TECH VOLS
April 11 TRIPLE RUDIMENTS * CANCELLED
April 15 PTP RUDIMENT CANCELLED – WRITTEN BY BRIAN LIVINGSTON CLASS XII
April 16 HEALTH FORM, USE OF OLD TECH VOLS
April 17 DIANETIC CASE FAILURES CURRENT TECH VOLS
April 17 DIANETIC CASE SUPERVISION CURRENT TECH VOLS
April 22 DIANETICS vs SCIENTOLOGY CURRENT TECH VOLS
April 22 SOMATICS AND OTS CURRENT TECH VOLS
April 23 DIANETICS BASIC DEFINITIONS CURRENT TECH VOLS
April 23 DIANETICS ERASURE HOW TO ATTAIN OLD TECH VOLS
April 23 PAST LIVES CURRENT TECH VOLS
April 23 BASIC DEFINITIONS CURRENT TECH VOLS
April 24 DIANETIC RESULTS CURRENT TECH VOLS
April 24 DIANETIC USE CURRENT TECH VOLS
April 24 PRECLEAR ASSESMENT SHEET OLD TECH VOLS
April 26 BAD INDICATORS CANCELLED
April 26 SOMATICS CURRENT TECH VOLS
April 27 DIANETIC FAILURES CURRENT TECH VOLS
April 27 R-3-R Restated COMMANDS ON SECOND RUN ON AN INCIDENT OLD TECH VOLS
April 28 HIGH TA IN DIANETICS CURRENT TECH VOLS
April 29 ASSESSMENT AND INTEREST CURRENT TECH VOLS
April 30 AUDITOR TRUST CURRENT TECH VOLS
May 01 GRINDING OUT ENGRAMS CURRENT TECH VOLS
May 04 DIANETICS MAJOR AUDITING FAULTS CANCELLED – WRITTEN BY BRIAN LIVINGSTON CLASS XII
May 05 TOUCH ASSISTS CANCELLED – WRITTEN BY BRIAN LIVINGSTON CLASS XII
May 06 DIANETICS AND REVIEW CANCELLED – WRITTEN BY BRIAN LIVINGSTON CLASS XII
May 06 ROUTINE 3-R REVISED ENGRAM RUNNING BY CHAINS CANCELLED – WRITTEN BY BRIAN LIVINGSTON CLASS XII
May 07 DIANETIC COURSE STUDY DRILLS * CANCELLED
May 07 DIANETICS EXTRACTS FROM EARLY BULLETINS CANCELLED – WRITTEN BY BRIAN LIVINGSTON CLASS XII
May 07 FLOATING NEEDLE CURRENT TECH VOLS
May 07 SUMMARY OF HOW TO WRITE AN AUDITOR’S REPORT, W/S… CURRENT TECH VOLS
May 07 THE FIVE GAEs CURRENT TECH VOLS
May 08 IMPORTANT STUDY DATA CURRENT TECH VOLS
May 08 REPETITIVE STUDY CANCELLED – WRITTEN BY TONY DUNLEAVY TRAINING AIDE
May 08 TEACHING THE DIANETICS COURSE CURRENT TECH VOLS
May 09 CASE SUPERVISING (New Era) DIANETICS FOLDERS CURRENT TECH VOLS
May 09 CASE SUPERVISOR FORMS OLD TECH VOLS
May 09 SUPERVISION DRILLS CANCELLED – WRITTEN BY TONY DUNLEAVY TRAINING AIDE
May 11 FORCING A PC CURRENT TECH VOLS
May 11 METER TRIM CHECK CURRENT TECH VOLS
May 13 PECULIARITIES CURRENT TECH VOLS
May 14 CULTURAL LAG CURRENT TECH VOLS
May 14 DIANETIC ASSISTS OLD TECH VOLS
May 14 FN AND ERASURE OLD TECH VOLS
May 14 SICKNESS CURRENT TECH VOLS
May 15 DIRTY NEEDLE CURRENT TECH VOLS
May 17 TRS AND DIRTY NEEDLES CURRENT TECH VOLS
May 18 ERASURE CURRENT TECH VOLS
May 19 DRUG AND ALCOHOL CASES PRIOR ASSESSING CURRENT TECH VOLS
May 19 HEALTH FORM, USE OF A BRIEF DESCRIPTION OF AUDITING OLD TECH VOLS
May 19 PASTORAL COUNSELLING HEALTH FORM OLD TECH VOLS
May 19 DRUG AND ALCOHOL CASES PRIOR ASSESSING OLD TECH VOLS
May 20 DIANETICS COURSE DATA OLD TECH VOLS
May 20 KEEPING DIANETICS WORKING IN AN AREA CURRENT TECH VOLS
May 21 ASSESSMENT CURRENT TECH VOLS
May 22 DIANETICS ITS BACKGROUND CURRENT TECH VOLS
May 22 NOTES ON CS INSTRUCTIONS CANCELLED – WRITTEN BY OTTO ROOS
May 23 AUDITING OUT SESSIONS NARRATIVE VERSUS SOMATIC CHAINS CURRENT TECH VOLS
May 24 DIANETIC HIGH CRIMES CURRENT TECH VOLS
May 24 THE DIFFICULT CASE CURRENT TECH VOLS
May 25 HIGH TA ASSESSMENT OLD TECH VOLS
May 26 DIANETICS STUDY AND DRILLS CANCELLED – WRITTEN BY BRIAN LIVINGSTON CLASS XII
May 27 EARLIER SIMILAR * CANCELLED
May 27 THE VIII’s NIGHTMARE CURRENT TECH VOLS
May 28 DIANETICS AND RESULTS DIANETIC COUNSELING GROUPS CURRENT TECH VOLS
May 28 HOW NOT TO ERASE CURRENT TECH VOLS
June 03 TR NOTES CANCELLED – WRITTEN BY OTTO ROOS
June 04 COMM IMPEDIMENTS CANCELLED – WRITTEN BY OTTO ROOS
June 05 TWO DIANETIC REMEDIES CANCELLED – WRITTEN BY BRIAN LIVINGSTON CLASS XII
June 06 CRAMMING CANCELLED – WRITTEN BY OTTO ROOS
June 06 PREDICTION AND CONSEQUENCES CURRENT TECH VOLS
June 07 DIANETICS POINTS WHICH GO OUT AND WRECK PCs CANCELLED – WRITTEN BY BRIAN LIVINGSTON CLASS XII
June 07 HOW TO MAKE A PERSON SOBER CURRENT TECH VOLS
June 10 LANGUAGE DICTIONARIES AND TRANSLATIONS CANCELLED J.EGGERS CL VIII
June 11 MATERIALS, SCARCITY OF CURRENT TECH VOLS
June 12 7 CASES R3R SET UP CANCELLED – WRITTEN BY OTTO ROOS
June 13 THE 3 WAY S and D CANCELLED – WRITTEN BY OTTO ROOS
June 19 DEFINITION OF TERMS CANCELLED – WRITTEN BY TONY DUNLEAVY TRAINING AIDE
June 23 FN OLD TECH VOLS
June 26 CLASS VIII PRE-AUDITING REQUIREMENTS. * CANCELLED
June 26 C/S—How to Case Supervise Dianetics Folders ** CANCELLED
June 26 ENGRAMS, HANDLING OF AND OTs ** CANCELLED
June 27 Q and A CANCELLED – WRITTEN BY OTTO ROOS
June 28 HOW TO CASE SUPERVISE DIANETICS FOLDERS CURRENT TECH VOLS
July 01 HIGH TA ASSESSMENT CANCELLED – WRITTEN BY BRIAN LIVINGSTON CLASS XII
July 03 HEALTH FORM AND SOMATICS CANCELLED – WRITTEN BY OTTO ROOS
July 04 AUDITING OF OT III PRECLEARS CANCELLED – WRITTEN BY BRIAN LIVINGSTON CLASS XII
July 04 DIANETICS STUDENT AUDITORS CANCELLED – WRITTEN BY BRIAN LIVINGSTON CLASS XII
July 05 Q and A CANCELLED – WRITTEN BY OTTO ROOS
July 10 STENOGRAPHIC AUDITING CANCELLED – WRITTEN BY BRIAN LIVINGSTON CLASS XII
July 10 EXTERIORIZATION REMEDY CANCELLED – WRITTEN BY BRIAN LIVINGSTON CLASS XII
July 10 FORMER THERAPIES AND EARLIER PRACTICES * CANCELLED
July 11 SUPERVISION CANCELLED – WRITTEN BY BRIAN LIVINGSTON CLASS XII
July 12 AMENDMENT TO 5 JUNE 1969, TWO DIANETIC REMEDIES CANCELLED – WRITTEN BY BRIAN LIVINGSTON CLASS XII
July 12 EXTERIORIZATION CANCELLED – WRITTEN BY BRIAN LIVINGSTON CLASS XII
July 12 STARTING DIANETICS ON PCS WHO HAVE HAD SCIENTOLOGY AUDITING CANCELLED – WRITTEN BY BRIAN LIVINGSTON CLASS XII
July 12 THE PC WHO HAS SOMETHING THAT HASN’T BEEN HANDLED CANCELLED – WRITTEN BY BRIAN LIVINGSTON CLASS XII
July 16 URGENT IMPORTANT FAILED SESSIONS CURRENT TECH VOLS
July 17 FLAGRANT AUDITING ERRORS CURRENT TECH VOLS
July 17 AMENDMENT AND ADD. TO CLASS VIII CS BULLETIN OF 10 DEC 1968 CANCELLED – WRITTEN BY BRIAN LIVINGSTON CLASS XII
July 17 (NEW ERA) DIANETIC COMMAND TRAINING DRILLS TR 101 AND 102 CURRENT TECH VOLS
July 18 DIANETICS AND VIII CANCELLED – WRITTEN BY OTTO ROOS
July 19 AUDITING PRE-OTS CANCELLED – WRITTEN BY BRIAN LIVINGSTON CLASS XII
July 19 DIANETICS AND ILLNESS CURRENT TECH VOLS
July 21 ONE-HAND ELECTRODES CURRENT TECH VOLS
July 21 R6-EW ** CONFIDENTIAL R6EW ONLY
July 22 AUDITING SPEED CURRENT TECH VOLS
July 22 HIGH TA ASSESSMENT OLD TECH VOLS
July 22 PASTORAL COUNSELLING HEALTH FORM OLD TECH VOLS
July 22 UNFLAT CHAINS CANCELLED – WRITTEN BY BRIAN LIVINGSTON CLASS XII
July 22 AUDITING SPEED OLD TECH VOLS
July 23 AUDITOR ASSIGNMENT PLICIES CURRENT TECH VOLS
July 23 HIGH TA ASSESSMENT AUDITING SPEED OLD TECH VOLS
July 24 SERIOUSLY ILL PCS CURRENT TECH VOLS
July 26 BODY AND STANDARD * CANCELLED
July 27 BPL WHAT IS A CHECKSHEET BPL
July 27 ANTIBIOTICS OLD TECH VOLS
July 27 HIGH TA AND ERASING * CANCELLED – WRITTEN BY PEACHES POOK
July 29 THE ART OF CASE SUPERVISION CURRENT TECH VOLS
July 30 STUDENT PROGRESS BOARD CANCELLED – WRITTEN BY TONY DUNLEAVY TRAINING AIDE
August 02 LX LISTS CURRENT TECH VOLS
August 03 LX2 EMOTIONAL ASSESSMENT LIST CURRENT TECH VOLS
August 04 LX3 OLD TECH VOLS
August 09 CASE FOLDER ANALYSIS, DIANETICS OLD TECH VOLS
August 09 LX1 (Conditions) CURRENT TECH VOLS
August 09 CASE FOLDER ANALYSIS, (NEW ERA) DIANETICS CURRENT TECH VOLS
August 12 DIANETIC CASE SUPERVISOR ACTIONS CANCELLED – WRITTEN BY BRIAN LIVINGSTON CLASS XII
August 12 HANDWRITTEN INSTRUCTIONS – OT III CONFIDENTIAL OT III
August 12 CASE SUPERVISOR ACTIONS CONFIDENTIAL CL VIII ONLY
August 12 CONFIDENTIAL – CASE SUPERVISOR ACTIONS CONFIDENTIAL CL VIII OT III
August 15 FLYING RUDS CURRENT TECH VOLS
August 16 HANDLING ILLNESS IN SCIENTOLOGY CURRENT TECH VOLS
August 21 TR 104 NOTE CANCELLED – WRITTEN BY TONY DUNLEAVY TRAINING AIDE
August 25 CONFIDENTIAL – ADD OT III CS OT III
August 25 DEFINITION OF ARCU CDEI * CANCELLED
August 26 FAILED OT CASES CONFIDENTIAL CLASS VIII
August 26 CONFIDENTIAL – OT III CASE SUPERVISION OT III
September 02 CANC OF BULLS 22 May 69 CS INSTR, 27 JUN 69 Q AND A CANCELLED – WRITTEN BY BRIAN LIVINGSTON CLASS XII
September 02 DIANETICS THE E-METER DEFINED CANCELLED – WRITTEN BY BRIAN LIVINGSTON CLASS XII
September 14 LEARNING PROCESSES EDUCATION BY DUPL AND REPETITION CANCELLED EXERPTED FROM 15ACC
September 14 LEARNING PROCESSES EDUCATION BY EVAL OF IMPORTANCE CANCELLED EXERPTED FROM 15ACC
September 14 LEARNING PROCESSES GROUP TEACHING BY DEF AGREEMENT CANCELLED EXERPTED FROM 15ACC
September 18 DIANETICS AUDITING AND OT III CONFIDENTIAL OT III
September 19 STUDY SLOWNESS CURRENT TECH VOLS
October 01 CONFIDENTIAL – OT VIII CONFIDENTIAL CL VIII
October 03 DIANETIC REMEDIES CANCELLED WRITTEN BY BELKACEM FERRADJ CS-5
October 03 URGENT – IMPORTANT LX 3 HANDLING OF * CANCELLED
October 05 DIANETIC TRIPLES OLD TECH VOLS
October 05 TRIPLE FLOWS CURRENT TECH VOLS
October 05 UNRESOLVING CASES OLD TECH VOLS
October 06 TRIPLE ERRORS IN DIANETICS OLD TECH VOLS
October 07 CONFIDENTIAL (OT III and above only) ** OT III
October 08 CONFIDENTIAL – OT III REMEDIES (OT III and above only) ** OT III
October 12 CONFIDENTIAL – SECRET – LDN OT III OT III
October 12 DIANETIC TRIPLES PLURAL ITEM CURRENT TECH VOLS
October 12 FORCING A PC OLD TECH VOLS
October 13 CLEARING COURSE CHARGE CONFIDENTIAL CLEARING COURSE ONLY
October 13 CONFIDENTIAL – OT III ERRORS CONFIDENTIAL OT III
October 17 DRUGS, ASPIRIN AND TRANQUILIZERS CURRENT TECH VOLS
October 25 CONFIDENTIAL – SECRET – OT III ONLY CONFIDENTIAL OT III
November 05 FOLDER SUMMARY CANCELLED – WRITTEN BY BELKACEM FERRADJ CS-5
November 05 GF TO FN * CANCELLED
November 05 LX 3 (ATTITUDES) CURRENT TECH VOLS
November 05 RE PREPCHECKS * CANCELLED
November 14 Medical Charts FO 2187 ISSUED AS HCOB IN 1991
November 15 CASE SUPERVISION AUDITING AND RESULTS CURRENT TECH VOLS
November 15 CASE SUPERVISION, HOW IT GOES NON-STANDARD CURRENT TECH VOLS
November 19 GF40 OUT OF VALENCE CASE CANCELLED – WRITTEN BY BELKACEM FERRADJ CS-5
November 20 SOME WORD DEFINITIONS FOR STUDENTS USE CANCELLED – WRITTEN BY MARY ROBINSON
November 23 STUDENT RESCUE INTENSIVE CURRENT TECH VOLS
December 02 RISING TA CURRENT TECH VOLS

Keep Scientology Working (KSW)

Pierre_Ethier-Scientology-Class-XII-Auditor

HOW TO KEEP SCIENTOLOGY FROM WORKING:

ABANDON ANY PART OF ITS TECHNOLOGY THAT CONFLICTS WITH PRIVATE INTERESTS OF ITS PRINCIPALS

People who have been running Scientology have not always had the most Ethical of Intentions. In fact, those running it for the last three decades have had intentions that have nothing to do with the improvement of people or their reaching true enlightenment.

It is common place among the criminal to accuse others of what they are themselves doing and therefore hide (they think) their true misdeeds by labeling them as being the opposite of what they truly are.

THE HIDDEN OBJECTIVES OF THE GOLDEN AGE OF TECH

The Golden Age of Tech is yet another example. it should have been called the Age of Darkness.

PRIMARY OBJECTIVE

The primary objective of the Golden Age of Tech is to “wipe clean the slate of auditors” by cancelling any certificate ever obtained (even under L. Ron Hubbard himself) and ordering them to lengthy retrains where auditors will be re-educated in the application of auditing.

Compare it to the following definition:

A systematic effort to eliminate an individual’s former loyalties and beliefs and to substitute them for a new ideology. It is best achieved by isolating and/or disconnecting from any anyone with divergent ideas, the insistence on exacting regimens that are not to be challenged or questioned, strong social pressures and rewards for cooperation; physical and psychological punishments for noncooperation, including social ostracism and criticism, deprivation of food, sleep, and social contacts, bondage, and torture; and constant reinforcement.

The above is the DEFINITION OF BRAINWASHING!

 SECONDARY OBJECTIVE

The secondary objective of the Golden Age of Tech is to implant the unimpeachable datum that RTC is infallible in technical matters and that any technical edict it issues should never be questioned, under penalty of excommunication and eternal damnation.  This will prove vital in getting all auditors under the control of the Church to blindly accept radical transformations in definitions and the technology without even needing to publish new bulletins,and accepting any verbal Tech issued by RTC as “undisputable truth”.

Thus we have the definition of a Floating Needle being perverted and causing thousands of unnecessary overruns.

This we have the Fabulous Ls Rundowns have been completely transmogrified and now being run according to lower level styles and techniques instead of their own unique ones, and over 50% of recipients at Flag being greatly unhappy (or worse) with them.

Thus we have the invention of the datum that people auditing on Solo NOTs must learn “How to Kill and F/N” and disavow their wins in order to benefit the Church through statistics and/or income.

Thus we have people being audited for hours over ARCXs with the auditor purposefully ignoring them because of some arbitrary or false datum he has been indoctrinated in.

TERTIARY OBJECTIVE

The tertiary objective of the Golden Age of tech are 1- to remove any call to judgment or understanding by auditors and replace it with inflexible rules and robotic protocols.

QUARTERNARY OBJECTIVE

The quaternary objective is the adoption of the false datum that any auditor or Case Supervisor applying fanatically the Golden Age of tech procedures can not possibly err. The corollary of that false axiom is that any and all complaints or disagreements about the programming, auditing or C/Sing merely indicate undisclosed misdeeds by the complainant(s).

Since the creation of the Golden Age of Tech, over half of the Solo NOTS completion have either openly defected or quietly departed from the Church. and nearly as many OT VIIIs. Church membership has dwindled by 60%. LRH repute has been torn to shred in the Media and on Internet and the Church under its current leadership has done nothing whatsoever to stop that trend, but only preoccupying itself at “defending David Miscavige” whenever he was justly attacked and criticized for his crimes.

HOW RTC HAS CORRUPTED THE TECH AND BETRAYED SCIENTOLOGY

When the Golden Age of tech was announced in 1996, the “Discovery” by David Miscavige was that the “Blind had been leading the Blind”. Nothing was said about the inescapable facts that

1- RTC by definition was the one leading on technical matters, and therefore being “The Blind”

2- Being Blind in that context (having low perception) is entirely the product of hidden misdeeds and contra-survival acts.

3- Therefore, announcing that RTC was entirely responsible for the Technology being applied the way it was (wrongly), Scientology public were expected to continue to blindly trust the same group of thugs that David Miscavige was broadcasting as having betrayed its public.

THE 10 COMMANDMENTS ACCORDING TO RTC

Since the Advent of RTC, in the 1980s, the Church of Scientology has completely failed in its mission of “Keep Scientology Working”. It has focused almost exclusively at controlling people, typically through Terror and the destruction of anyone who “had other Fish to fry” (an expression that has come to mean doing or thinking anything that is not written in the new Tables of the Law written by RTC.  The Laws being:

1- Thou shalt not question nor doubt any rule or order issued by or on behalf or RTC, no matter how off-policy or destructive it may seem to be.

2- Thou shalt submit all of your dynamics under the control and orders of the Church and accept all directives to suppress one or more dynamics, including Divorce, Abortion or Disconnection without challenge or disobedience.

3- Thou shalt lie and deceive even under oath, if it benefit the Church without feeling there is the slightest wrong in doing so.

4- Thou shalt not save any money for yourself, your future or your children, but donate without examination everything you own to the Church. You will get into debt without any limitation as long as you keep being ordered to do so by a Church official.

5- Thou shall disconnect as destructively as possible from anyone who disagrees with the Church, the way it is being run or who criticizes any of its principals.

6- Thou shalt refuse to listen to any communication or examine any data that seek to prove or explain how you may have been lied to by the Church, declaring that anything unflattering about the Church or its principals is by definition entheta and a lie.

7- Thou shalt accept any orders to apply Scientology, its Tech or its Admin differently than you have learned if RTC orders it as they know better than anyone else.

8- Disavow or disconnect from your Father and Mother, sisters and brothers, spouse or children whenever  it is ordered to by an Ethics Officer.

9- Never doubt anything you are told at any Church Briefing or official publication, nor  ever try to confirm their accuracy. Use the Internet solely for purposes immediately related to your job and refuse to read anything about Scientology, the Church or any of its principals, as the Church of Scientology never lies to its members.

10- Only follow goals of yours that are directly and explicitly approved by the Church. Change your goals, the instant you are told by an Ethics Officer or other authorized Church personnel that they are wrong. Disregard the Code of Honor. It is only written for PR purposes.

STEP 0 OF KSW

Over the course of years an additional step has surreptitiously been added  to the 10 points of KSW:

Step 0 of KSW: Abandon the Technology, or least the bits that those in charge want discarded  to satisfy their political or financial interests. Hundreds of good Bulletins have been cancelled and never been replaced. Thousands of mental or spiritual breakthroughs been ignored or suppressed and parts of the technology developed by L. Ron Hubbard been kept indefinitely storage, in order to maximize financial gain by the Church of Scientology.

The following links show by year an exhaustive and complete list of all Technical Issues published along with their current status (where they can be found, of if cancelled or suppressed).

As a rule all issues written by someone else than LRH have been cancelled, even if doing so caused knowledge or vital advice to be lost. For example: Bulletins about Triple Rudiments have never been replaced and as a result, almost every auditor in the field have been mis-running Triple or Quad Rudiments using wrong or out-tech commands.

Scores of detailed drills covering anything from Handling Audiences to auditing correctly every processes on the Grades or actual Case Remedies have been cancelled without ever being replaced.

LIES IN THE PROMOTION OF THE GOLDEN AGE OF TECH

Decades after the wholesale cancellation of hundreds of Drills, an Impostor, who is also a failed auditor and an acknowledged NO CASE GAIN and who shows NO CHANGE as a down stat administrator created something he calls the GOLDEN AGE OF TECH, largely plagiarizing earlier cancelled bulletins that were written by Class XIIs and other Highly trained individuals as ordered by L. Ron Hubbard. He falsely claimed authorship behind them, defaming earlier Class XIIs and Highly trained auditors who had complied with  LRH orders to create drills for every single occasion, lying in front of an audience of thousands claiming that LRH orders had never been complied with when they had.

Hundreds of bulletins gave vital technical advice and examples of application, but were cancelled without replacement nevertheless. This includes Bulletins on auditing  Autistic Children, The secret reason why OTs can cave in or act badly, dynamic assessments and many other subjects.

It is immutable policy in the Church of Scientology, to cancel every single bulletin or materials written by a person who has just fallen out of favor or been branded suppressive, even if no replacement or substation is made. As a result there are gaping holes in the training auditors and errors and mistakes that would have been easily avoided have been committed in the name of “Keep Scientology Working” when the slogan KEEP SCIENTOLOGY WORKING was merely a hypocritical front for people who had no interest in the betterment of others so that they could order the demonizing and vilifying anyone who dared disagreeing or thinking an independent unsanctioned thought.

COMPLETE OF ALL TECHNICAL ISSUES EVER PUBLISHED

Due to the large amount of work required to make such a list, it is being done,one year at a time.

The first year that has been compiled is the year 1969.

COMPLETE OF ALL TAPED LECTURES EVER PUBLISHED

In 1976 a FLAG TAPE MASTER LIST was compiled and issued. It had a few omission, but was by far the most complete list ever published by the Church.

In the 1990s, the late Ken Ogger who gave himself for nickname “THE PILOT” published the most exhaustive list of LRH conferences ever made and sought to correct and add to it.

Using my own unique background as a Class XII and Sea Org Member on Tech lines at Flag for nearly 20 years and numerous contacts and sources of help, I have filled the holes in the Pilot lists and explained the current status of each lecture.

Since the advent of the Golden Age of Tech a number of lectures have been quietly buried and the very name and existence of those conferences been erased from scientology official teaching. The Church current position is that those lectures never existed, even though they exit in previous compilations. The Church has ordered destruction of those conferences by any of the faithful who still happen to own one.

For the year 1969 the Golden Age of Knowledge states that “No LRH lecture exists”, yet I was able to confirm by title and date 13 LRH lectures made that year.